HighCastle of Geek

​A blog/journal about my life and the stuff I like. Popular subjects include music, guitars, gear, books, movies, video games, technology, humor.

Filtering by Tag: Home Theater

Another post in the recent "flurry"...

I’m not sure what’s motivating me to post more after months of silence, maybe it’s just taking time for things to sort of settle with the big shift in lifestyle. As mentioned before, there have been more cooking and DIY activities as of late. Although these aren’t completely new, I’ve definitely had more time to engage in these activities. Many things have been put off for years when I was working because I used my free time for music practice primarily, and never felt motivated to get the gears turning on larger tasks.

With this latest round of projects, I’ve been approaching them incrementally. With rare exception, I have certain daily activities I will always engage in - walking the dogs, exercise, basic maintenance like showering and washing clothes, and usually practicing a few instruments. My more recent DIY projects have included whole house ethernet including moving the modem and router to upstairs locations as well as upgrades to my switching system. I’ve also made some minor changes/upgrades to the home theater with the addition of a speaker wall plate and ensuring all the devices have wired ethernet courtesy of the new router location. In the process, there’s been a fair amount of running cables through the attic and down through walls, resulting in a fair amount of damage to the drywall in the garage and drum room especially.

This has necessitated the purchase of some new tools and supplies so I can hopefully by the time I’m finished have a decent result that at least looks passable if not like new. I know that’s achievable, but my recent experience hasn’t elevated my skills to the level of a professional. All this rehashing to say that it’s satisfying to pick a goal for any given day and accomplish it without any great snags. Yesterday was a decent day in that regard. One of the casualties of my recent cable relocations in the home theater was the original HDMI cable for the projector that had been there since we moved in seven years ago. Too many twists and kinks corrupted the signal, so it was time to replace it. Our attic compares favorably to a suburban squeeze sauna Mirkwood forest, and the area over the home theater is bramble central. Thankfully the total distance of the cable run from equipment rack to projector is relatively short (less than ten feet in the actual room), but getting there and getting the cable through the particular openings in the wall/ceiling is akin to being hogtied while trying to play twister on a tightrope over a bed of liquid hot magma.

I did discover an easier way to get the cables through the projector mast (read - I had routed the original cable through a narrow opening that wasn’t the intended and much easier route) and so after wrestling with the cables a bit I managed to get them where they needed to go with an adequate amount of slack. I also ran some CAT 6 cable along with the new 4K HDMI for a few reasons. One, the projector has an ethernet jack that I originally thought was for connectivity and firmware updates, but now I’m thinking it’s more for control devices. The other advantage to having ethernet there is that if I eventually get an HDMI balun, it will allow me to send the video signal as well as IR and a few other control schemes via just the ethernet cable which is easier to run and more resistant to damage than the HDMI cable.

All that rambling to say that I managed to pull it off and the home theater is back to full functioning. I still have some house cleaning to do on the wall (missing a plate for a new hole) and I’ve got future upgrade plans that I’ll address in the years to come. I had thought of hiring an audio/video installer to handle an upgrade to ATMOS ceiling speakers, but after all this crawling around I think I might be able to handle it myself. But that’s a project for a way down the road and not until I return to some sort of employment.

I’m going to piecemeal the remaining tasks which are initially finishing the drywall repair and then I start focusing on clean up/organization of the video room and server closet.

The COVID-19 Languish and Other Updates (including DIY tedium, consider yourself warned)

This may be the biggest gap between posts in several years. As of my last updates, I was laid off at the end of March, and here we are four months later with no end in sight. This pandemic has shifted mindsets and people’s general philosophies of life and work, and I’ve been no exception. I’ve not been depressed or succumbed to a long term funk, but there has been a shift in purpose and a slowing of pace. I was already ambivalent about many things that other people obsess over, but these tendencies have coalesced further.

To the surprise of no one, the current administration has not only grievously mishandled the pandemic, but they’ve also arguably taken actions to make it worse for most Americans. The US has suffered the worst outcomes from this plague, currently with over 140,000 deaths and nearing four million confirmed cases. Multiple republican lead states tried to rush back into normal operations way too soon and are now seeing spikes in their numbers, notably my home of residence, Texas. Thankfully, the rich have continued to get richer in no small part at the hands of the republican senate and white house. I very naively thought that even they would still possess a shred of ethics and human sympathy given the international disaster, but their greed knows no bounds.

At work, they have nationally adopted a three-phase return to normal operations plan that is mostly based on delaying routine and non-life saving care until the numbers plateau and begin to decrease. It appeared our first efforts to lock down and distance were having a beneficial effect on the trends, but the rush back to “normal” has dealt some severe setbacks so the VA needle has gone back to zero at present. In a recent presentation, the director in Dallas predicted that we were only 1/8th of the way through the pandemic, meaning it would take two years to run its course. There has been some promising news about successful vaccine trials in the UK and elsewhere, so it remains to be seen if we may see a viable and available vaccine by year’s end. That being said, I can only expect our current executive branch will find a way to screw that up as well.

Right now I’d be happy to return to work in 2020, but it’s feeling more and more like it will be 2021 or even later. We’ve been trying to keep our heads above water financially, and so far we’re still holding on. Our cash reserves have dipped from their pre-layoff levels, but we’ve also had several unplanned (and not necessarily essential) expenditures. Among these were a new lawnmower, several new tools (cordless drill, oscillator, etc.), new bulb for the projector, new battery for the Highlander, and the single biggest expenditure - the Gandalf/Frodo masters collection statue I had put a big down payment on last year. I would never have made this purchase in our current situation, but it’s a very limited edition and I would have forfeited the down payment if I canceled. It’s rare enough that I know I can sell it for a tidy sum in the future, although I have no plans to do so.

The tool (and supplies) purchases were part of a DIY project to finally run ethernet to all the rooms upstairs as well as make a modest upgrade to my switching setup. The layoff has shifted a lot of my priorities and I’ve been spending more time on cooking and DIY projects. I’m still practicing guitar, drums, keys, and vocals although bass has been neglected for several months. I also lost the spark for writing, drawing, and Korean language study but I have plans to resume. My typical day has been wake-up/coffee/casual internet, walk the dogs, exercise, and then some combination of practice with maybe some cooking depending on the amount of leftovers available. This is generally followed by maybe some reading, video games, and then television/movies/youtube.

With every day being a blank canvas, I don’t typically push things too hard to completion knowing I’ll have plenty of time to finish them in the future. This has resulted in the ethernet project being strung out over several weeks, although this has partly been predicated by incremental purchases as I’ve realized I need additional items. Ultimately, I’d like to have all my various rooms wired for ethernet and able to access the home network for file sharing at the best possible speeds and security. I’m essentially already there for the critical rooms and I only need to install one more drop in the “Forge” as I’m now calling it. This is the combination drawing/craft table and guest bedroom. The ethernet drop will go in the wall behind the tv and is not a high priority at present. It’s more likely to become useful if I ever place an actual PC or Mac in that room.

I’ve set up a “server” (sans server at present) closet in the video room, along with all the camera supplies. Eventual plans include custom-built shelving along the walls and probably a server rack (and server). These are long-range and likely more dependent on whether I return to work, especially the server. In the immediate future I need to organize the clutter and implement some cable management. I’ve got the ONT cable run from the garage up through the drum room closet and into the attic, then across the attic to my server closet.

A single ethernet cable runs from there to the wireless router in the home theater. This serves the entire house for wireless internet. It feeds a cable that runs back to the old location in the master bedroom closet where a switch feeds drops to several downstairs locations. These came with the house and are unused at present because Aeyong only uses wireless (phone, iPad, MacBook), but I’m leaving them connected in case. Two cables come out of the switcher back up into the attic and feed drops in my control room and drum room, respectively. These were run after we moved in by milestone electric and my recent DIY forays revealed the piecemeal nature of their work.

The installer essentially just found the path of least resistance so he ran the ethernet drop for the drum room down the same hole as the electric wiring and I haven’t looked up close, but I’m guessing it’s the same for the control room. Thankfully this doesn’t seem to have negatively affected the performance, although I may move those drops slightly in the future, time and motivation allowing. I’ve done enough rerouting of cables in the attic that I now have a good idea of where everything enters and exits, so it’s a bit more straightforward, but still a huge pain in the ass. The basic message from my attic is stay out and don’t waste your golden years.

In the process of rerouting cables, I needed to drill down from the attic into walls in several locations including the garage, drum room/closet, and video room. It took a bit of rooting around to find the desired locations, so there was a fair amount of drywall sawing and top plate drilling. I learned in the process that the upstairs wall of the drum room is offset from downstairs by about 6-12 inches. This was discovered by drilling up through the wall of the garage into the floor of the drum room, which, as you may have guessed, was unintentional and highly undesirable. After more measuring and brainstorming, I ultimately decided the best route would be through the drum room closet, as it appeared to be directly above the garage wall where I wanted to come in, largely because that’s where ATT has their breakout box to convert the fiber to ethernet.

Because of these multiple attempts, drywall repair was needed in several places in the garage, drum room, and one small spot in the video room. I also needed to put some spray foam installation to seal those unintended holes in the drum room floor. The initial repairs have now been completed, and just yesterday I sanded the first coat of drywall mud that had been applied. I also decided to try and fix up the rat’s nest of cabling behind my home theater rack. This consists of a new wall plate for the speaker wire, coaxial (direct), HDMI for the projector as well as a small control module for the universal remote/projector. I started that process yesterday and I’m thinking I’m about halfway done. In a recurring theme, the installers of the speaker and ethernet cables went with the easiest possible solution, so I’ve got a metric crap-ton of cabling that was just haphazardly passed through a big opening in the wall.

I was able to install a four-port ethernet jack for the feed from the ATT modem as well as the feedback from the router that runs back to the old master closet switch. The other two ports are active but aren’t needed at present. The router has eight ports, so these have been enough to accommodate all the needs in the home theater proper. I was able to separate the speaker cabling so I will now have the lines from the speakers terminate behind the wall into the plate and then have a separate cable that runs from the plate to the receiver. It’s all connected by banana plugs on both sides. I hope my audio signals (not to mention all the other connections) don’t suffer any degradation due to these attempted upgrades. Worst case scenario, I can always re-run the cabling if necessary, but I really hope I don’t need to do that.

I’ve still got several steps left in this current project including a (hopefully) finish coat on the drywall, texture, and paint. I’ve still got a few small holes in the garage to patch, although they should be a breeze compared to what’s preceded them. I’m also considering adding an electrical outlet to the server closet, but I’m going to save that until all the low-voltage stuff is done and dusted.

A bit past four months…

I'm a little late to the four month mark party, but feel compelled to mark these countdown milestones.  The last month has seen a few good developments, not the least of which is a fairly significant downturn in enemy activity in the last few days. It's been colder here for a few days and that may be the main reason. Since the last countdown milestone they have fixed the dryers in the laundry which has somewhat improved our laundry turn around time (there's no fix for the ambivalent workers employed there); and most significantly they repaired two of the treadmill belts so now I can run again.

I was a bit overly optimistic the first day and ran 5 miles in my rekindled trotting exuberance.  I paid the price of pain for several days afterwards. Luckily, my legs have been convinced that it's in everyone's best interest if they don't sit the rest of the season out and I was able to run 3 miles on Friday and feel like doing 3 or 4 today.

Another significant improvement was the arrival of my PS3 (thanks to my better half) and a modest home theater speaker system I had ordered online. We now have a high def, surround sound capable theater and video game room in the aid station. I'll upload pictures of movie night in action here in the future. We christened the new setup with the Blu Ray version of the most recent Incredible Hulk movie with Edward Norton. Watching a high def movie on a 70 inch screen with surround sound is quite sublime considering.

On the same mail truck I also received a nice desk chair for my room that has made the extended keyboard/guitar practice sessions much more forgiving to my sitting points of contact (use your imagination). With the gradual improvements it has become almost livable here. Knowing the Army, it's way past time to bring the suck to our happy home here if at all possible.  Until then, I'm going to enjoy our new standard of living.